This project involves removing current pipes and installing a new, durable watermain on 51 Street from 44 Avenue to 46 Avenue in Linsford Park.

Watermains deliver clean drinking water and fire protection to homes and businesses.

What residents can expect during construction:

  • Temporary full or partial lane closures
  • Sidewalks or driveways may have limited access at certain stages
  • Increased noise, dust, and equipment on-site during daytime work hours
  • Temporary water service interruptions may occur when connecting the new line

Timeline: Summer – Fall 2026

Funding: City of Leduc

Questions or concerns? Submit it online or call (780)-980-7107

What is happening?

GS Construction is currently working on a water replacement program in your neighborhood. As part of this work, it is necessary to temporarily shut down the water main servicing your property.

When will the water service interruption occur?

To complete this work, your water service will be shut off from 8:00 a.m. to approximately 4:00 p.m on the date listed above.

What will happen if there are changes to the work schedule?

We apologize for this inconvenience and will continue our work until service can be restored. If, for some reason, your water service needs to be shut off for a longer period of time, or we are unable to do work at this time, we will notify you again.

Will I be able to obtain water during the service interruption?
No. Please draw enough water for your needs prior to the shut down and turn off the power to any equipment that could be damaged by a water supply loss (e.g. boilers for heating, water-cooled computers, refrigeration systems and air conditioners).

Are there any specific instructions for me?
Yes. To maintain the same water quality in your home, after your water services are restored, we strongly recommend you run the cold water for five minutes through each one of your taps, including basement and outside taps, starting with the bathtub faucet as it does not have a screen to allow material to be flushed from the system.

Who can I call if I have questions about the service interruption?
If you have any questions or concerns related to this interruption in your water supply, please see the job foreman on site, or phone the number listed below.

  • Project Supervisor: (587)-566-3419
  • Project Superintendent: (587)-338-3067

Construction Project - Linsford Park Watermain Line Replacement

Date Status
June 17, 2026 Construction start is anticipated for the week of July 6 2026 (weather pending). Temporary water bypass to impacted households is anticipated to start the week of June 24, 2026.
June 22 GS Construction will be delivering notices to residences that will be affected by temporary water setups and any scheduled water interruptions. Contact information for questions and clarifications will be on the notices or see the temporary water service interruption Q&As.
July 7 GS Construction will be mobilizing to site this week with expected construction to start later in the week.
July 9 Temporary water service will be activated for properties at the north end of the project near 46 Avenue as construction activities start and progress south. Access to private property may be temporarily impacted during construction activities. The Contractor will coordinate directly with affected property owners to maintain access whenever possible. All affected residents should have received a notice containing contact information. Crews will be saw-cutting hard surfaces and completing removals in preparation for pipe installation expected to begin early next week.