A road overlay adds a new layer of asphalt on top of an existing road. This maintenance process is one of the most effective ways to extend the life of a roadway without doing road reconstruction. An overlay restores the road to a smoother driving surface and protects the road from future damage.

Road overlay projects are shorter than a reconstruction but still require some short-term disruption. Watch for and follow the posted signage notifying motorists about upcoming traffic disruptions.

Questions or concerns? Submit it online or call (780)-980-7107

Road overlay work will occur on:

  • 42B Avenue between South Park Drive and 39 Avenue
  • 39 Avenue between 39 Street and 42B Avenue

Timeline: Summer – Fall 2026

Funding: City of Leduc

Construction Project - 42B Avenue

Date Status

Road overlay work will occur on:

  • South Park Drive, including 43A Avenue and 43B Avenue, between Black Gold Drive and 41A Avenue
  • 43B Avenue and 44A Street
  • 43 Avenue between South Park Drive and 42 Street
  • 42B Avenue

Timeline: Summer – Fall 2026

Funding: City of Leduc

Construction Project - South Park

Date Status

Road overlay work will occur on:

  • Caledonia Drive between Munn Way and Campbell Road
  • Douglas Lane and Douglas Court

Timeline: Summer – Fall 2026

Funding: City of Leduc

Construction Project - Tribute

Date Status

Road overlay work will occur on:

  • Northern section of Sparrow Drive
  • Off-ramp from the QEII
  • Sparrow Crescent to extend the life of the road

Timeline: Summer – Fall 2026

Funding: City of Leduc

Construction Project - Sparrow Drive

Date Status
May 15 DeFord Contracting Inc. to begin construction on May 19, work during the first week will mostly be concrete repairs on Sparrow Cr., from south to north intersections with Sparrow Dr. Periodic traffic interuptions will be necessary including lane closures. Access to business will be maintained at all times.

Road overlay work will occur on: 65 Avenue between the rail crossing and 45 Street. A new right turn bay will be added to the eastbound lane at the 65 Avenue and 45 Street intersection to turn southbound onto 45 Street.

Timeline: Summer – Fall 2026

Funding: City of Leduc

Construction Project - 65 Ave

Date Status

Road overlay work will occur on:

  • Discovery Way

Timeline: Summer – Fall 2026

Funding: City of Leduc

Construction Project - Discovery Way

Date Status

Road overlay work will occur on:

  • 50 Street between 50 Avenue and 59 Avenue

Timeline: Summer – Fall 2026

Funding: City of Leduc

Construction Project - Sparrow Drive

Date Status
May 15 DeFord Contracting Inc. to begin construction on May 19, work during the first week will mostly be concrete repairs on Sparrow Cr., from south to north intersections with Sparrow Dr. Periodic traffic interuptions will be necessary including lane closures. Access to business will be maintained at all times.